
Surface prices
| Surface | Per m² | 25m² | 40m² | 60m² |
|---|---|---|---|---|
| Gravel | £60 | £1,500 | £2,400 | £3,600 |
| Tarmac | £90 | £2,250 | £3,600 | £5,400 |
| Block paving | £100 | £2,500 | £4,000 | £6,000 |
| Resin-bound | £120 | £3,000 | £4,800 | £7,200 |
Source: Checkatrade, April 2026. MyBuilder's August 2026 data puts most work in a £50 to £130 per m² range.
Extras that move the price
- Removing an old drive, especially thick concrete.
- Excavation depth, which depends on the ground and the surface.
- Drainage: channel drains, soakaways or a permeable base.
- Edging and borders in blocks or setts.
- UV-stable resin for coastal homes, which costs more than standard resin.
- Steps and walls.
- A new or wider crossing, priced by Redcar and Cleveland Borough Council. UK averages are about £1,800 for new and £1,100 for widening (Checkatrade).
Coastal considerations that affect cost
Near the seafront, spending a little more on UV-stable resin, stainless or aluminium edging and grids for gravel avoids early replacement. That is money well spent.
Comparing quotes
Ask each firm that quotes for the area, excavation depth, sub-base, surface specification, edging, drainage, waste removal and guarantee in writing. A quote missing several of these is not comparable.
Repairs
If your drive is sound underneath, a repair such as re-laying a sunken area or resurfacing worn tarmac can cost much less than a new drive. See driveway repairs.
Common questions
What is the cheapest drive?
Gravel, at about £60 per m².
Is resin worth the extra in Redcar?
If you want a smooth, permeable finish and choose a UV-stable resin, it lasts well.
Is the dropped kerb included in drive quotes?
Usually not. The council prices it separately.
Why do quotes vary so much?
Groundwork: excavation, sub-base, drainage and waste.